New corona viruses are still threatening people’s lives, and demand for hand sanitizers continue to increase. Engineering Solutions, LLC provided HVAC and plumbing engineering services for a Kansas manufacturing facility to begin manufacturing of the hand sanitizer.
Phase 1 included an interior Tank Room with ISO 8 cleanroom requirements and a Hazard classification of H-1, Division 2. With tight temperature, humidification, ventilation, and filtration requirements, we worked closely with the design build contractor and equipment suppliers to meet all Codes and regulatory, and Owner requirements.